Olympic Stadium 2012

London UK

Project Team

Fulcro Lead BIM Coordinator (Supporting)
   
  Spatial Design +
Coordination Modelling Specialist
   
Client Team Stadium 2012
Architect Populous
Structure Buro Happold
Services Buro Happold
Landscape Hyland Edgar Driver
Prime Contractor Sir Robert McAlpines
BIM Coordinator Fulcro (Project)
Scroll Down Icon
Fulcro F Logo

Olympic Stadium 2012

Completion Date: 2012

The 2012 London Olympics was a truly iconic event that cemented the legacy of our capital city into Olympic folklore. Fulcro were incredibly proud to play their part in delivering this prestigious project.

A highly elaborate and detailed design proposal was needed to ensure there were no significant delays or risks to the development. Fulcro was appointed to develop a 3D model that would show exactly how the construction would take place, and how the project would progress through every level. We established a Baseline 3D Model of Stage E design, and managed the incorporation of information from the various trades into a fully coordinated digital prototype.

slide 1
slide 1
slide 1
slide 1
slide 1
slide 1
Image Slide 2
Image Slide 2
Image Slide 2
Image Slide 2
Image Slide 2
Image Slide 2

Once the 3D model was created the design could then be managed and changes assessed with ease. This model also became a baseline for conflict resolution. Clashes and conflicts were resolved within a 3D virtual environment and the solutions communicated in a clear and concise manner resulting in reduced issues during construction on-site.

For more information about Fulcro services please contact us here

Knightsbridge estate
slide 1
slide 1
slide 1
slide 1
Image Slide 2
Image Slide 3
Image Slide 2
Image Slide 2
Image Slide 2
Image Slide 1

Additional content acknowledgement and thanks goes to:

Morley von Sternberg

Populous