Fulcro Enabled Improved Construction Program Performance
Fulcro provided 3D and 4D Construction Simulation, than enabled alternative delivery methods and sequencing, leading to improving package performance by 40%.
3D Digital Prototyping of Design Removed Risk and Created Project Certainty
Reduced Risk, Reduced Costs delivered through 3D Digital Design and Coordination.
Visualisation of Design
27% Increase in Asset Value Enabled By Visual Simulation
4D Construction and Assembly Simulation
We integrate 3D CAD systems with scheduling data to enable visual (model)-based planning for safe, predictable, and optimized construction execution.
A Friendly, Innovative, & Highly Skilled Team
We are collaborative, and welcome open and authentic people to join us.

Operational Ready Design Delivered by People, Process and Applied Technology

We enable projects be delivered;

  • Faster
  • Improved Quality
  • Improved Value

Our talented team is constantly pushing and exploring the boundaries to turn our customers’ ideas into reality.

We thrive on a challenge and believe that what we can achieve is unlimited.

Our team has a wealth of experience, having worked in the UK and abroad on award-winning green public buildings, multi-use developments, historical architecture and listed buildings.  

Fulcro - creating project certainty

Our contact details

  • Fulcro - Unit 3A, Wixford Park, George's Elm Lane, Bidford-on-Avon, Warwickshire, B50 4JS
  • +44(0) 1789 490000
  • info@fulcro.co.uk